amcjavelin
Active member
well I had this south Yuba mining sluice with mini hopper a while back but I couldn't get the water flow I needed because the riffle was so steep so material would hang up right there so first thing I did got rid of the 5/8" pex spray bars had the made bigger will be using a 3/4" pvc and installed some gold hog razorback matting[video]http://youtu.be/UYDNEVdp1MQ[/video]